Grid connection

ALL NRG holds the world record for offshore grid connection. Our involvement in more than 90% of the world's installed offshore wind turbines and numerous onshore projects, proves that.

Offshore and onshore wind turbine grid connections and submarine cable projects are carried out by ALL NRG's skilled electricians in a close cooperation with the project organisation of your company.

ALL NRG is constantly involved in large installation projects throughout Europe and in the rest of the world. And we always work closely with leading wind turbine manufacturers. Since 1990, we have been responsible for a problem-free grid connection of thousands of wind turbines onshore and offshore.

Therefore, we have a lot of experience assembling the right team and running the project safely through all phases. Our technicians hold all the required qualifications and certificates to perform offshore jobs.

VALUE PROPOSITIONS:

  • World leader for offshore Grid Connection
  • We have grid connected more than 90% of the world’s installed offshore wind turbines
  • Unique experience and knowhow
  • Appointed installation manager on every single project
  • Close cooperation with leading turbine manufactures
  • We take full responsibility
  • Risk Assessments/Method Statements before every assignment
  • Well documented procedures
  • We bring our own tools and test equipment
Lars Rasmussen

Lars Rasmussen

Senior Sales Manager, High Voltage

Send e-mail

+45 7010 1022

+45 4091 7659

Esben Rocatis Nielsen

Esben Rocatis Nielsen

Senior Manager, Head of High Voltage Manning

Send e-mail

+45 7010 1022

+45 4034 9774