Commissioning

ALL NRG takes full responsibility for the grid connection and commissioning of individual wind turbines and/or an entire wind farm, both onshore and offshore.

We have conducted the grid connection and other electrical installation jobs on approximately 2000 offshore wind turbines worldwide. This corresponds to more than 90% of the largest established offshore wind turbine farms. Therefore, we have one-of-a-kind experience in the technical challenges and long-term project processes.

Based on the project description, we assemble the right team of technicians with all the necessary skills and certificates. At the same time, we appoint an experienced installation manager who is responsible on-site. We see to it that a complete set of tools and measuring and safety equipment is available in accordance with the requirements and specifications of the job. Everything is carried out in close cooperation with our technical department and the wind turbine manufacturer’s site manager.

ALL NRG provides products and services for:

  • Planning
  • Project Management
  • Procedures
  • Risk Assessment
  • Method Statement
  • Mechanical
  • Electrical
  • Testing HV/MV/LV
  • Inspection
  • Power system analysis
  • WTG Handover